News

This is Our Latest Project Competed

     

A Tropical Landscape with low maintenance design

  • Diamond Zoysia Sod, which is new to Florida
  • Low water usage plant material
  • We installed a Rain Water Harvesting System with a 12,000 gallon cistern
  • A sprinkler system with low water emitting sprinklers
  • A weather station that adjusts the irrigation according to amount of sunlight, humidity, temperature, wind, and rainfall
  • L.E.D. low voltage lighting was installed for electricity savings.

See photos from this Project